Storage Rack Upright Post Roll Forming Machine in Russia

Storage Rack Upright Post Roll Forming Machine in Russia

Short Description:


  • Raw material: Galvanized steel
  • Warranty: 3 years
  • Export port: Tianjin port
  • Payment Terms: T/T, L/C, D/A, D/P
  • Container: 40 feet container
  • Working days: 50 working days
  • Product Detail

    Product Tags

    Roll forming machine

    Roller material: 45# steel with 0.05mm chrome

    roller surfaces polish, hard plating dealing

    Polished surface and heat treatment towards molds can keep the molding plate surface smooth and not easy to be marked when it is being stamped

    6
    7
    9
    8
    4
    3

    Work flow of Roll Forming Machine

    Decoiler-roll forming machine-PLC control box-hydraulic cutter-Run out table

    roll forming machine work flow

    Feeder decoiler

    3T MANUAL (2)

    It is used to stand the steel coil and uncoil, keep them work stably

    Loading capacity: 3 tons

    Coil inner size: 470-530 mm

    Work type: Manual operation

    Color: As customer' request

    Machine cutter

    It adopts the hydraulic drive and automatic location to decide the dimension and cut the target products.

    Material of blades: Cr12, quenching treatment

    5

    Feeding table

    Insert  raw material (steel plate) through the beach to manufacture and process

    It can guarantee coil go straight and the out products neat, parallel

    10

    Control box

    control box

    DETAL PLC control system

    Target piece`s length is adjustable and digit

    Two modes operate: automatic and manual type

    Button press and screen touch operate, easy operate

    Language: Chinese and English or as acustomer' need

    Hydraulic oil pump

    IMG_4887-5 (2)

    Hydraulic oil into the hydraulic oil tank

    Pump motor drives the cutter work

    Motor Power: 5.5 KW

    Hydraulic oil: 46# Oil

    add capacity: oil add 3/4 of box capacity

    Oil pressure: 8-10 MPa

    Receiving table

    IMG_7437-

    Length: Common 2-3 m

    Operate : Manual work

    Used to collect the finished pieces

    Support roller to transmit pieces

    Easy for panel take away by forklifts

    Spare parts free for customer

    QQ截图20211229161100

    Packing & Payment & Service

    1). Packing method: Nude, seller should guarantee equipment will be moisture-proof, anti corrosive, and will not be damaged during transportation.

    2). Payment Term: 30% of total contract value paid by T/T, last 70% paid by T/T after inspection by buyer in seller’s factory while before delivery.

    3). Delivery Time: The seller guarantees the equipment will be ready for shipment within 60 working days after receipt of deposit from the buyer.

    4). Service: We could send technician to your country to fix the machine if you need. The buyer need to pay for all the cost, including: visa, round trip tickets, accommodation, salary of USD 120 per day.

    5). Warranty: 36 months During warranty, the replaceable parts are free, but the buyers need to pay for the shipping fee.

    6). Package: One complete equipment needs a 40 feet container to hold.

    Certificate CE & ISO9001

    QQ截图20211229161629

    We sell country

    图片4

  • Previous:
  • Next:

  • Write your message here and send it to us